Utility Coordination
Pepco service upgrade, WASA, Washington Gas, and all utility applications for 6100 Chillum
2 critical-path utility items still pending — these may delay construction milestones.
Tenant improvement permit for full facility buildout. Includes structural, MEP, and use change to cannabis cultivation.
Upgrade electrical service to support cultivation facility load — LED lighting, HVAC, irrigation pumps. Estimated 400-600A 3-phase service required.
Upgrade water meter to support irrigation system demand. RO system + irrigation = significant daily water usage.
High-speed fiber internet for security camera system, METRC connectivity, remote monitoring of environmental controls.
Verify existing gas service capacity for HVAC backup heating. Confirm no upgrade needed.