Open Items

Facility spec open items · Decision tracking · Owner assignment

81
Total
77
Not Started
4
In Progress
0
Complete
24
Critical Open
#DescriptionOwnerPriorityStatus
1
Initiate Pepco service upgrade — 326 kW, 600A 480V service
Happy Oklahoma + Reno JamesCRITICAL
IN PROGRESS
3
Schedule DC ABCA pre-application meeting
Happy Oklahoma + ZattyCRITICAL
NOT STARTED
5
Confirm DE HPS ballast input voltage (240V vs. 277V)
ZattyCRITICAL
NOT STARTED
6
Confirm rolling bench supplier and obtain shop drawings
Happy OklahomaHIGH
NOT STARTED
7
Field walk as-builts with Cornerstone Architecture
Happy Oklahoma + CornerstoneCRITICAL
IN PROGRESS
8
Commission asbestos/lead survey before fit-out work begins
Happy OklahomaHIGH
IN PROGRESS
9
Roof membrane assessment
Happy OklahomaHIGH
NOT STARTED
10
Confirm DC ABCA mandated seed-to-sale platform
Compliance CounselCRITICAL
NOT STARTED
11
Schedule DC DOH pre-application meeting for kitchen
Happy OklahomaHIGH
NOT STARTED
12
Confirm nutrient program — drives stock tank concentration ratios
ZattyHIGH
NOT STARTED
14
Confirm full candy/chocolate confection program is intended kitchen scope
ZattyHIGH
NOT STARTED
15
Confirm staffing plan — restroom count, break room, ADA
ZattyMEDIUM
NOT STARTED
17
Confirm container spacing density on rolling benches
ZattyHIGH
NOT STARTED
18
Confirm UCL fixture model and manufacturer
ZattyCRITICAL
NOT STARTED
21
Confirm far-red end-of-day protocol intent
ZattyHIGH
NOT STARTED
22
Coordinate rolling bench riser mount compatibility with bench supplier
Happy OklahomaHIGH
NOT STARTED
23
Revise Pepco load study to 326 kW, 600A switchgear
Happy Oklahoma + Reno JamesCRITICAL
IN PROGRESS
24
Reno James to confirm HVAC unit counts per room dimensions and UCL heat loads
Reno JamesCRITICAL
NOT STARTED
25
Confirm 277V input availability for UCL fixture model
Happy Oklahoma + Reno JamesHIGH
NOT STARTED
26
Confirm Pepco 120/208V retention vs. disconnection timeline
Happy Oklahoma + Reno JamesHIGH
NOT STARTED
28
Audit all existing circuits on 120/208V panels
Reno James + CornerstoneHIGH
NOT STARTED
29
Confirm kitchen equipment voltage — Avantco IC1800 is 120V per A-124
Zatty + Kitchen SupplierHIGH
NOT STARTED
30
Confirm Pepco single account final state process
Happy Oklahoma + Reno JamesMEDIUM
NOT STARTED
31
Size step-down transformer precisely — 150-225 kVA for 600A service
Reno JamesHIGH
NOT STARTED
32
Reno James to develop UCL conduit routing drawing
Reno JamesHIGH
NOT STARTED
34
Confirm refrigeration panel supplier — long lead item; engage immediately
Happy Oklahoma + ZattyCRITICAL
NOT STARTED
35
PE-stamped letter for condensing unit roof point loads
Reno JamesHIGH
NOT STARTED
36
All trades coordinate penetration locations with panel layout before fabrication
All Trades + CornerstoneCRITICAL
NOT STARTED
37
Confirm refrigeration panel face material — aluminum vs. FRP
Happy Oklahoma + Panel SupplierHIGH
NOT STARTED
38
Confirm refrigeration panel barn door light seal spec — sole light barrier for flower rooms
Happy Oklahoma + Panel SupplierCRITICAL
NOT STARTED
39
Confirm refrigeration panel wall base detail — base channel, floor seal, epoxy sequencing
Panel Supplier + Reno JamesHIGH
NOT STARTED
40
Confirm rough opening for 48" barn door in 4" refrigeration panel wall
Happy Oklahoma + Panel SupplierCRITICAL
NOT STARTED
41
Confirm top-track anchor detail and load rating for barn door hardware
Happy Oklahoma + Panel SupplierHIGH
NOT STARTED
42
Confirm floor guide detail — no trip hazard, no irrigation water trap
Happy Oklahoma + Panel SupplierHIGH
NOT STARTED
43
Confirm dry room door gasket spec — 55-62% RH under repeated door cycles
Happy Oklahoma + Panel SupplierHIGH
NOT STARTED
44
Confirm mom room door seal integrity under positive pressure
Happy Oklahoma + Panel SupplierHIGH
NOT STARTED
45
Confirm door spec: prop, processing, waste, fertigation, packaging, pre-roll, cure vault
ZattyHIGH
NOT STARTED
47
Confirm Liberty Pumps 404 model variant per location
Reno JamesHIGH
NOT STARTED
48
Confirm sump pit dimensions and slab cutting locations — clear of reinforcement
Reno JamesCRITICAL
NOT STARTED
49
Confirm N+1 pump redundancy at FR3, veg, mom, prop sumps
ZattyHIGH
NOT STARTED
50
Confirm Aroya substrate sensor density per room — drives OpenSprinkler zone count
ZattyHIGH
NOT STARTED
51
Confirm 0.3 GPH emitter pressure at emitter with 18" whip friction loss
Reno James + Happy OklahomaHIGH
NOT STARTED
52
206 solar panels confirmed — field verify exact locations before rooftop equipment placed
Happy Oklahoma + Solar InstallerCRITICAL
NOT STARTED
53
Confirm solar installer contact — coordinate condensing unit placement
Happy OklahomaHIGH
NOT STARTED
54
Confirm green roof consultant if applicable
Happy OklahomaHIGH
NOT STARTED
55
Reno James to account for varied refrigerant line set lengths — distributed rooftop
Reno JamesHIGH
NOT STARTED
56
PE letter confirming condensing unit point loads on existing roof
Reno JamesHIGH
NOT STARTED
57
Map all available rooftop placement zones after solar panel locations field verified
Happy Oklahoma + CornerstoneCRITICAL
NOT STARTED
58
AHJ written confirmation that 48" barn doors satisfy egress requirements
Cornerstone + ZattyCRITICAL
NOT STARTED
59
Confirm refrigeration panel fire rating meets DC Building Code occupancy separation
Cornerstone + Panel SupplierCRITICAL
NOT STARTED
60
Submit fire rating documentation with building permit application
CornerstoneCRITICAL
NOT STARTED
61
Reno James to confirm FR1 HVAC unit count — 5 active HGRH units
Reno JamesCRITICAL
NOT STARTED
62
Reno James to confirm FR2 HVAC unit count — 5 active HGRH units
Reno JamesCRITICAL
NOT STARTED
63
Reno James to confirm FR3 HVAC unit count — 4 active HGRH units
Reno JamesCRITICAL
NOT STARTED
64
Confirm on-call HVAC SLA and spare parts inventory plan
ZattyHIGH
NOT STARTED
65
Confirm Dosatron D14MZ2 dilution ratio accommodates grower stock solution concentrations
Happy OklahomaHIGH
NOT STARTED
66
Baseline municipal water quality test — EC, pH, alkalinity, hardness, chloramine
Happy OklahomaHIGH
NOT STARTED
67
Confirm dechlorination protocol for municipal water
Happy OklahomaHIGH
NOT STARTED
68
Confirm fertigation room dimensions for stock tank and batch tank layout
Cornerstone + Happy OklahomaHIGH
NOT STARTED
69
Confirm 16 ft AFF ceiling panel height — verify no conflicts with existing structure
Cornerstone + Reno JamesHIGH
NOT STARTED
70
Confirm sump pit locations clear of existing reinforcement — GPR scan recommended
Reno JamesCRITICAL
NOT STARTED
71
Confirm waste room dimensions and HPS lamp disposal cabinet spec
Cornerstone + ZattyHIGH
NOT STARTED
72
Confirm odor mitigation plan for DC ABCA application
Happy Oklahoma + Compliance CounselHIGH
NOT STARTED
73
Confirm water usage plan for DC ABCA application
Happy Oklahoma + Reno JamesHIGH
NOT STARTED
74
Confirm waste management plan for DC ABCA application
Happy Oklahoma + Compliance CounselHIGH
NOT STARTED
75
Confirm roof membrane condition before placing condensing units
Happy OklahomaHIGH
NOT STARTED
76
Confirm Veg room LED fixture model and wattage — drives HVAC unit count
ZattyHIGH
NOT STARTED
77
Confirm Prop room dimensions for panel order
CornerstoneHIGH
NOT STARTED
78
Confirm Dry room dimensions for panel order
CornerstoneHIGH
NOT STARTED
79
Confirm Prop room HGRH availability — inverter mini-split may be required
Reno JamesHIGH
NOT STARTED
80
Confirm cure vault precision mini-split spec — 60-65°F, 58-62% RH continuous
Reno JamesHIGH
NOT STARTED
81
Confirm processing room dimensions and layout
CornerstoneHIGH
NOT STARTED
82
Confirm rolling bench modular sections fit room lengths without custom cutting
Happy Oklahoma + Bench SupplierHIGH
NOT STARTED
83
Confirm RFID reader placement — Zebra FX7500 at cultivation room exits and dry room entry
Security IntegratorHIGH
NOT STARTED
84
Confirm CCTV camera count and placement per DC ABCA requirements
Security IntegratorHIGH
NOT STARTED
85
Confirm kitchen dimensions accommodate full A-124 equipment schedule
Cornerstone + ZattyHIGH
NOT STARTED
86
Confirm solar panel field locations before any rooftop equipment placed
Happy Oklahoma + Solar InstallerCRITICAL
NOT STARTED
87
Confirm epoxy coved base spec — height and material
ZattyMEDIUM
NOT STARTED
88
Confirm zoning — cannabis cultivation use at 6100 Chillum Place NE
Compliance CounselCRITICAL
NOT STARTED
89
Confirm ADA compliance requirements for the facility
CornerstoneHIGH
NOT STARTED
90
Confirm epoxy floor coved base height per DC DOH requirements (kitchen)
Cornerstone + ZattyHIGH
NOT STARTED